| Back to Search Results | New Search | Revise Search | Next Boat |
270' 2011 Orucoglu Yacht & Marine Construction Miss Tor 270 - EUR 42,990,000 |
| Year: 2011 Insure It |
| Length: 270 ft Survey It |
|
Price:
EUR 42,990,000 (US$55,396,914) Finance It |
| Located in: Unknown, Turkey Transport It |
| More Boats from this Seller |
| |||||
| Fuel | Diesel | Hull Material | Steel | ||
| Beam | 43 ft 5 in | Max Draft | 13 ft 6 in | ||
| Engine Make | CAT | Engine Model | 3516 | ||
| Length Overall | 270 ft | Number of Engines | 2 | ||
| Gallery |



























| |||
Denison Yacht Sales is happy to announce that it has been named the exclusive global representative for Miss Tor Yachts, built by Orucoglu Shipyard in Turkey. |
|||
| |||
| Displacement: 1450 tons | |||
| |||
| Total Power: 3350 | |||
| |||
| Due to the current economic conditions Miss Tor Yachts has eliminated the additional costs of its interiors on its pricing, and has come up with one 'All Inclusive' rate thatoffers significant discount from the original pricing scheme, delivering a turn-key yacht at an unbeatable price. | |||
| |||
| Miss Tor Yacht's Italian design firm Raggio offers 4 distinct interior design options: Classic, Riviera, Baroque, or Art Deco. In addition, the buyer is allowed to bring in their own design team to work alongside Raggio or the buyer can work with Raggio alone to customize a layout suitable for their style and taste. This options makes Miss Tor Yachts truly unique in that it will cater to its clients every need and make the owner's dreams a reality. Additional renderings of the interior decor options are available upon request. |
|||
| |||
It is a motor yacht which can perform the following: |
|||
| |||
| An estimated build time is 20-24 months. Together with its offer, ORUCOGLU shall provide the ship owner with a building schedule of the vessel. The main steps of the construction shall be outlined and the time required for the construction of the project shall be specified. ORUCOGLU shall have to point out the critical path. |
|||
| |||
| Upon delivery, ORUCOGLU shall provide with a folder including all user manuals of the equipment installed. The administrative documents required for navigation shall be provided for by ORUCOGLU. | |||
| |||
| The contract price submitted by ORUCOGLU shall include all modifications asked by the shipowner if these modifications or changes do not affect the gist of the specifications. If major changes are required by the ship owner, their impact on price and deadlines shall be defined by ORUCOGLU before being accepted by the ship owner before execution. No modification shall be made without prior written approval of the ship owner or his representative | |||
| |||
| Any tests or trials required at any time by the Classification Society and the statutory authorities of materials, components, connections, machinery etc. will be carried out. Moored trials will be carried out to ensure correct performance of all machinery. During the moored trials, propulsion machinery, all engine room auxiliary machinery and all deck machinery will be thoroughly tested. All electrical systems and electronic equipment will be fully tested. All safety devices, automatic and remote control systems will be shown to be satisfactory operation. | |||
| |||
| Spare parts will be provided in accordance with the classification Society regulations. Proper storage will be arranged for the spare parts. | |||
| |||
| With its cost estimate, ORUCOGLU must provide the ship owner with a delivery term. During delivery, all documents necessary for the good operation of the ship shall be delivered to the ship owner. The vessel shall be delivered launched and in operating condition. The vessel shall be cleaned up and all building tools and equipment must be withdrawn from the vessel before delivery. |
|||
| |||
| The vessel and its equipment must be under guarantee after the vessel delivery date. During this period, all defects must be repaired at the shipyards expense except for defects resulting from the equipment faire wear and tear. | |||
| |||
| The hull shall be made in A grade steel On board net quantity assessed to: 1050,000 Kg Rudders shall be made in A grade steel. The Fly bridge (and only roller ball) shall be made in Aluminum Alloy. (This item will be specified in the business contract) The hull and the superstructures are made with a deflection between the frames of 5 mm maximum, in order to enable a high quality painting without grouting. (See painting and marking) | |||
| |||
| The Structure type is mixed (Longitudinal and Transversal). Scantlings are calculated for a speed of 14 knots at full load. Double bottom structure is constructed longitudinally framing style. Double bottom plate and structure is continuously placed from Fore collusion bulkhead to aft extremity. There is a place over double bottom tanks in both sides in order to get a smooth stability. Other tanks are arranged for diesel oil tanks in both sides in order to get a smooth stability. Other tanks are arranged for diesel oil tanks for different voyage distances. Dirty oil and bilge tanks arranged in engine room areas. In foreward area of double bottom there is a bow thruster space and bow thruster placed in it. | |||
| |||
| All tanks are built in the structure and equipped with access panels. | |||
| |||
| 2 daily tanks All tanks are between the ER bulkheads Tanks are built in the vessel structure Each tank is equipped with: -1 dismountable access panel of standard dimension -1 filing pipe -1 vent pipe -1 connection at the lowest point for cleaning |
|||
| |||
| Lower Deck: They are in grade A steel. Superstructures are constructed acc. To RINA rule, in longitudinally system. On the aft part of lower deck between frames aft extremity & 7 steering gear, garage area is placed. All hydraulic equipments are located in this area. There are two accesses for mentioned area: one is from aft hydraulic door (3000x1800), the other if from main deck entrance. There is a passage to electric room from Fr. 7. In electric room (Frames 7-13) there are two generators, electric panels and boards. These equipments are placed in separate room for operational easiness, to get silence comfort in accommodation, additional safety for fire. Main Engine Caterpiller 3516-C, all pumps and technical equipments ae located in engine room. Engine room is ventilated by fans and protected from fire by Co2 system. Fore bulkheads of engine room are constructed in frames 21 and 24 to get silence comfort in master cabins. The tanks located between mentioned bulkheads are used for DO settling and service facilities. Galley and cold & dry stores are located between frames 24 and 30. Swimming pool and resting area is located in lower deck. At the fore side of this region a revolving stairs group arranged. All cabins have approx 16m2 living area, 3m2 WC and shower area. Crew cabins, crew saloon and toilets are located in lower deck. Six rooms are located in this region. Entrance of the crew cabins corridor is from main deck and fore castle deck. Crew cabins entrances are as isolated as possible from passenger living areas. 1st Deck There is a living space on the aft part of deck saloon approx. 72m2. In the middle of deck saloon there is dining table and on the starboard side bar. On the port side of this saloon there is piano hall. Total area of deck saloon is approx 200m2. On the Aft side there are two passage ways are located both sides of the deck to reach 2nd deck and to get well mooring operation. One glass door on the aft is located for entrances. Revolving stairs group arranged at the end of saloon lets passengers to reach 1st, 2nd, 3rd deck and lower deck. Port side of stairs there is an elevator serving the same decks. On the fore side of 1st deck 6 duplex master cabins are located. At the end of master cabins corridor, 90m2 duplex owner suit is located. Large windows are located on both sides of owner suit and master cabins. On the port and starboard sides toilets are located for general use. |
|||
| |||
| 2nd Deck Upper deck aft region has approx.50m2 open area There is a grande atrium saloon in closed region. Fore side of atrium both sides are arranged for media saloon. Revolved stairs group in the middle of this deck. Hamman and Sauna is located at the entrance of duplex master cabins. Living rooms of master cabins and owner suit is located on fore side of the 2nd deck 3rd Deck Upper deck aft region has approx 20m2 open area. There is a camine hall in aft closed region of 3rd deck 38m2 cinema hall is in the middle of deck. Captain and pilot rooms are arranged at aft of wheel house. Each room has his own WC/Shower units 4th Deck 4th deck is arranged for sunbath and 8m part of the deck is closed for fitness at the top of the yacht. Antennas, radars, navigational signals are located on the closed part of the fly bridge deck. One Jacuzzi is arranged at the aft of flying bridge. |
|||
| |||
| Propulsion system The main propulsion system must generate a minimum of vibration Designer chose a propeller, propulsion shaft, soft mounted engine, geared engine connection with soft coupling rudder thrust reduction gear, hard mounted Main engines (RINA approval) Caterpillar 3516-C- mounted on elastic suspension Engine reduction gear couplings (RINA approval) The main engines are soft mountedReduction gears are thrusts and are hard mounted Soft couplings between main engines and reduction gears. Reduction gears (RINA approval) 2 pcs reduction gears ratio 4:1 Propeller shaft (RINA approval) 2 pcs shaft lines in stainless steel L, diameter: 250 mm Length: 5750 mm (to confirm) Rudders (RINS approval) 2 rudders are installed Stern Tube Length of stern tube is 2600mm |
|||
| |||
| Bowthruster Quantum C120 type 532mm bow thruster tunnel located behind fore collision bulkhead Bollards and fairleads 4 double Bollards wih fairleads on the fore castle deck 2 double Bollards on side walks on main deck 2 double Bollards on aft side of main deck 2 double Bollards on aft platform deck Light Mast A Light mast above flying bridge deck and a fore mast located on fore castle deck. Flying Bridge Flying bridge is designed to carry radars, antennas, navigation lights. Covering It'll be specified in business contract abour responsibility of covering Partian panels Inner partion walls between cabins, alleyways or other accommodation rooms will consist of IMAC Partition Panel, thickness is 50 mm, and fire rating is B15 Lining Panels Linings of steel walls, staircase will consist of IMAC Lining Panel, thickness 25 mm and fire rating BO Ceiling Panels Ceilings will be IMAC Ceiling Panel, thickness is 25 mm and fire rating is BOCeramic Tiles Finish of non-slip ceramic tiles as per yards standard. D�cor according to Owners choice from sub suppliers standard programs Ceramic tiles will be provided in the galley/ pantry, laundry and dry provision room and in the sanitary cells. Tiles will be laid with slope to scuppers. Quality of PVC-floor, rubber floor, etc. as per yards standard. Decors according to Owners choice from sub-suppliers standard collection. Stair Covering PVC stair nosing with non-slip surface will be used for all stairs in the accommodation area |
|||
| |||
| RINA Approval 2 IVECO 125Kw generators are installed. All generators shall be in separate room for sound proofing Manual coupler between generators Bow thruster 800mm diameter QUANTUM bow thruster system, with reduction 2:1 is installed. |
|||
| |||
| Thermal insulation and soundproofing (RINA approval) A60 Engine Room Inside to outside sequence: Microdrilled metal sheet with 1 mm thick stainless steel finishing Glued glass fabric Rock wool 120 Kg/m3 thickness 40 mm Lead plate 0.5 mm thick Rock wool 100 Kg/m3 75 mm thick A60 Inside to outside sequence: Microdrilled metal sheet with aluminum finishing thickness 8/10th Glued glass fabric Rock wool 120 Kg/m3 thickness 40 mm Rock wool 100 Kg/m3 75 mm thick B30 Inside to outside sequence: Microdrilled metal sheet with aluminum finishing thickness 8/10th Glued glass fabric Rock wool 120 Kg/m3 thickness 40 mm Rock wool 100 Lg/m3 75 mm thick Soundproof Inside to outside sequence: Grating Rock wool 100 Kg/m3 thickness 40 mm Ventilation ducts with A60 protection Exhausts are isolated with rock wool and cerablanket This insulation shall play a double role: fire insulation and sound proofing Bulkheads shall be isolated up to he tanks or ballasts. Plankings will be isolated up to under waterline level light. Detection Fire detection will be made by a central certified for 16 areas Automatic fire extinguishment in engine room CO2 Inert gas plant 990 Kg) 6 nozzles in the engine room Gas will be injected once air intakes are shut off and alarm is triggered inside the engine room. An audio and visual alarm in the bridge and in the engine room shall foretell the gas injection in the engine compartment. CO2 bottles will be located above the freeboard deck, under the starboard aft stairway in a naturally aired compartment. The plant will be fitted with check valves Fire extinguishers (ship owner provision) Extinguishers are CO2 5 Kg tyoe and ABC dry chemical 6 Kg The number and allocation of fire extinguishers are defined by the classification society. Compressed Air A compressed air system must be installed on the vessel 1 compressor 50 240l/m-low pressure 1 distribution network with outlets in all rooms and on the bridges |
|||
| |||
| The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice. | |||
| |||||||||||
| Denison Yacht Sales | |||||||||||
| Location | Contact Information | ||||||||||
Downtown Yachting Center |
| ||||||||||
| Let us know you found it on Boats.com! | |||||||||||
Request More Info Request Brochure Request Appointment |
||||||
|
||||||
| Listing ID: 11876811 |
| More Boats from this Seller | ||||
2011 Orucoglu Yacht & Marin... US$ 41,308,800 Turkey |
2009 Orucoglu Yacht & Marin... US$ 7,616,310 Turkey |
2011 Orucoglu Yacht & Marin... US$ 6,325,410 Turkey |
2013 Columbus Yachts Global... US$ 64,545,000 Naples, Italy |
2014 Mondo Marine M60 US$ 54,217,800 Savona, Italy |