- High density foam / 25mm balsa
- Sandwich construction above waterline
- 1st Three layers of hull lay-up ? Vinylester resin
- (4) Longitudinal stringers on the hull ? port & starboard sides
- Longitudinal & lateral fiberglass stringers filled with high density foam
- (20) Transverse floor on bottom of hull
- Deck is 25 mm / 19mm balsa core sandwich lay-up
- White gelcoat exterior
- Flange between deck & hull bedded with 3M 5200
- Fastened with stainless steel bolts of 8mm diameter at 6? center
- PU foam placed between bulkhead & hull to prevent print through
- Mast step made of mild steel
- Teak areas include side deck, cap rail, forward sun berth recess, forward cockpit seat, forward cockpit floor, pilot seats, passage on cabin top, aft cockpit seat, aft cockpit floor & transom swimming plate
- Non-skid areas include forward cabin top, pilot house top, port & starboard side of aft cabin top, pilot seat coaming & life raft locker top
|